Description | 한국남부발전(주)_설계기술용역 시공도급계약 현황(안동)에 대한 데이터로 구분, 계약번호, 계약명, 계약자 등의 항목을 제공합니다. |
---|---|
Author | 한국남부발전(주) |
URL | https://www.data.go.kr/data/15043392/fileData.do |
Dataset has 2 (1.6%) duplicate rows | Duplicates |
계약번호 is highly overall correlated with 구분 and 2 other fields | High correlation |
계약명 is highly overall correlated with 구분 and 2 other fields | High correlation |
계약자 is highly overall correlated with 구분 and 2 other fields | High correlation |
구분 is highly overall correlated with 계약번호 and 2 other fields | High correlation |
구분 is highly imbalanced (80.1%) | Imbalance |
계약번호 is highly imbalanced (52.5%) | Imbalance |
Reproduction
Analysis started | 2024-04-06 08:34:53.903122 |
---|---|
Analysis finished | 2024-04-06 08:34:54.818568 |
Duration | 0.92 seconds |
Software version | ydata-profiling vv4.5.1 |
Download configuration | config.json |
구분
Categorical
HIGH CORRELATION
  IMBALANCE
 
Distinct | 2 |
---|---|
Distinct (%) | 1.6% |
Missing | 0 |
Missing (%) | 0.0% |
Memory size | 1.1 KiB |
시공도급계약 | |
---|---|
설계기술용역 | 4 |
Length
Max length | 6 |
---|---|
Median length | 6 |
Mean length | 6 |
Min length | 6 |
Unique
Unique | 0 ? |
---|---|
Unique (%) | 0.0% |
Sample
1st row | 설계기술용역 |
---|---|
2nd row | 설계기술용역 |
3rd row | 설계기술용역 |
4th row | 설계기술용역 |
5th row | 시공도급계약 |
Common Values
Value | Count | Frequency (%) |
시공도급계약 | 125 | |
설계기술용역 | 4 | 3.1% |
Length
Common Values (Plot)
Value | Count | Frequency (%) |
시공도급계약 | 125 | |
설계기술용역 | 4 | 3.1% |
계약번호
Categorical
HIGH CORRELATION
  IMBALANCE
 
Distinct | 14 |
---|---|
Distinct (%) | 10.9% |
Missing | 0 |
Missing (%) | 0.0% |
Memory size | 1.1 KiB |
PAD-P-11EF1 | |
---|---|
2012-03-01 | |
PAD-P-M02 | 2 |
제2011-3-05호 | 2 |
PAD-P-M01 | 2 |
Other values (9) |
Length
Max length | 13 |
---|---|
Median length | 11 |
Mean length | 10.534884 |
Min length | 9 |
Unique
Unique | 9 ? |
---|---|
Unique (%) | 7.0% |
Sample
1st row | C0993-11-2012 |
---|---|
2nd row | PAD-P-M02 |
3rd row | 제2011-3-05호 |
4th row | 제2011-3-05호 |
5th row | 2012-03-01 |
Common Values
Value | Count | Frequency (%) |
PAD-P-11EF1 | 60 | |
2012-03-01 | 54 | |
PAD-P-M02 | 2 | 1.6% |
제2011-3-05호 | 2 | 1.6% |
PAD-P-M01 | 2 | 1.6% |
C0993-11-2012 | 1 | 0.8% |
C8200-12-1001 | 1 | 0.8% |
C8200121002 | 1 | 0.8% |
C8200121003 | 1 | 0.8% |
C8200121004 | 1 | 0.8% |
Other values (4) | 4 | 3.1% |
Length
Value | Count | Frequency (%) |
pad-p-11ef1 | 60 | |
2012-03-01 | 54 | |
pad-p-m02 | 2 | 1.6% |
제2011-3-05호 | 2 | 1.6% |
pad-p-m01 | 2 | 1.6% |
c0993-11-2012 | 1 | 0.8% |
c8200-12-1001 | 1 | 0.8% |
c8200121002 | 1 | 0.8% |
c8200121003 | 1 | 0.8% |
c8200121004 | 1 | 0.8% |
Other values (4) | 4 | 3.1% |
계약명
Categorical
HIGH CORRELATION
 
Distinct | 17 |
---|---|
Distinct (%) | 13.2% |
Missing | 0 |
Missing (%) | 0.0% |
Memory size | 1.1 KiB |
안동주기기구매_GS(보험포함, 잠정분) | |
---|---|
안동주기기_롯데건설(보험포험, 잠정분불포함) | |
안동천연가스발전소 야드 건설공사(경일건설) | |
안동천연가스발전소 야드 건설공사(동아건설) | |
안동천연가스발전소 야드 건설공사(롯데건설) | |
Other values (12) |
Length
Max length | 26 |
---|---|
Median length | 25 |
Mean length | 22.333333 |
Min length | 9 |
Unique
Unique | 9 ? |
---|---|
Unique (%) | 7.0% |
Sample
1st row | 안동천연가스발전소 사택신축 설계 용역 |
---|---|
2nd row | 안동천연가스발전소 보조보일러 설치조건부 구매계약 |
3rd row | 안동천연가스발전소 건설 설계기술용역 |
4th row | 안동천연가스발전소 건설 설계기술용역 |
5th row | 안동천연가스발전소 야드 건설공사(경일건설) |
Common Values
Value | Count | Frequency (%) |
안동주기기구매_GS(보험포함, 잠정분) | 30 | |
안동주기기_롯데건설(보험포험, 잠정분불포함) | 30 | |
안동천연가스발전소 야드 건설공사(경일건설) | 18 | |
안동천연가스발전소 야드 건설공사(동아건설) | 18 | |
안동천연가스발전소 야드 건설공사(롯데건설) | 18 | |
안동천연가스발전소 건설 설계기술용역 | 2 | 1.6% |
안동천연가스발전소 수폐수처리설비 구매 | 2 | 1.6% |
안동천연가스발전소 보조보일러 설치조건부 구매계약 | 2 | 1.6% |
신축사택 전기공사 | 1 | 0.8% |
기계공작실 및 종합창고 신축공사 | 1 | 0.8% |
Other values (7) | 7 | 5.4% |
Length
Value | Count | Frequency (%) |
안동천연가스발전소 | 62 | |
야드 | 54 | |
안동주기기구매_gs(보험포함 | 30 | |
잠정분 | 30 | |
안동주기기_롯데건설(보험포험 | 30 | |
잠정분불포함 | 30 | |
건설공사(경일건설 | 18 | 5.4% |
건설공사(동아건설 | 18 | 5.4% |
건설공사(롯데건설 | 18 | 5.4% |
및 | 4 | 1.2% |
Other values (24) | 41 |
계약자
Categorical
HIGH CORRELATION
 
Distinct | 16 |
---|---|
Distinct (%) | 12.4% |
Missing | 0 |
Missing (%) | 0.0% |
Memory size | 1.1 KiB |
롯데건설(주) | |
---|---|
지에스건설(주) | |
경일건설 주식회사 | |
동아건설산업(주) | |
한신보일러(주) | 2 |
Other values (11) |
Length
Max length | 16 |
---|---|
Median length | 10 |
Mean length | 7.9844961 |
Min length | 4 |
Unique
Unique | 9 ? |
---|---|
Unique (%) | 7.0% |
Sample
1st row | (주)유탑엔지니어링건축사사무소 |
---|---|
2nd row | 한신보일러(주) |
3rd row | 현대엔지니어링(주) |
4th row | 현대엔지니어링(주) |
5th row | 경일건설 주식회사 |
Common Values
Value | Count | Frequency (%) |
롯데건설(주) | 48 | |
지에스건설(주) | 30 | |
경일건설 주식회사 | 18 | 14.0% |
동아건설산업(주) | 18 | 14.0% |
한신보일러(주) | 2 | 1.6% |
현대엔지니어링(주) | 2 | 1.6% |
한성크린텍(주) | 2 | 1.6% |
(주)유탑엔지니어링건축사사무소 | 1 | 0.8% |
유창종합건설(주) | 1 | 0.8% |
태성전력 주식회사 | 1 | 0.8% |
Other values (6) | 6 | 4.7% |
Length
Value | Count | Frequency (%) |
롯데건설(주 | 48 | |
지에스건설(주 | 30 | |
주식회사 | 21 | |
경일건설 | 18 | 12.0% |
동아건설산업(주 | 18 | 12.0% |
한신보일러(주 | 2 | 1.3% |
현대엔지니어링(주 | 2 | 1.3% |
한성크린텍(주 | 2 | 1.3% |
주성전기통신(주 | 1 | 0.7% |
신진종합건설(주 | 1 | 0.7% |
Other values (7) | 7 | 4.7% |
단위공사명
Text
Distinct | 58 |
---|---|
Distinct (%) | 45.0% |
Missing | 0 |
Missing (%) | 0.0% |
Memory size | 1.1 KiB |
Length
Max length | 43 |
---|---|
Median length | 32 |
Mean length | 26.705426 |
Min length | 11 |
Characters and Unicode
Total characters | 3445 |
---|---|
Distinct characters | 157 |
Distinct categories | 8 ? |
Distinct scripts | 3 ? |
Distinct blocks | 2 ? |
Unique
Unique | 6 ? |
---|---|
Unique (%) | 4.7% |
Sample
1st row | XA02 안동-사택신축 공사(별도발주) |
---|---|
2nd row | BM02 안동-보조보일러 구매 |
3rd row | A 안동-설계기술용역 |
4th row | A 안동-설계기술용역 |
5th row | YJ01 안동-(YARD)계측제어설비 공사 |
Value | Count | Frequency (%) |
및 | 60 | 11.3% |
설치공사 | 29 | 5.5% |
신축공사 | 23 | 4.3% |
기초공사 | 14 | 2.6% |
공사 | 10 | 1.9% |
건물 | 10 | 1.9% |
축조공사 | 8 | 1.5% |
기기 | 7 | 1.3% |
안동-(설치조건)hrsg | 6 | 1.1% |
부속설비 | 6 | 1.1% |
Other values (154) | 359 |
Most occurring characters
Value | Count | Frequency (%) |
403 | 11.7% | |
설 | 167 | 4.8% |
A | 155 | 4.5% |
공 | 139 | 4.0% |
안 | 135 | 3.9% |
사 | 132 | 3.8% |
동 | 129 | 3.7% |
- | 129 | 3.7% |
0 | 127 | 3.7% |
) | 122 | 3.5% |
Other values (147) | 1807 |
Most occurring categories
Value | Count | Frequency (%) |
Other Letter | 1877 | |
Uppercase Letter | 534 | 15.5% |
Space Separator | 403 | 11.7% |
Decimal Number | 254 | 7.4% |
Dash Punctuation | 129 | 3.7% |
Close Punctuation | 122 | 3.5% |
Open Punctuation | 122 | 3.5% |
Other Punctuation | 4 | 0.1% |
Most frequent character per category
Other Letter
Value | Count | Frequency (%) |
설 | 167 | 8.9% |
공 | 139 | 7.4% |
안 | 135 | 7.2% |
사 | 132 | 7.0% |
동 | 129 | 6.9% |
치 | 99 | 5.3% |
조 | 87 | 4.6% |
기 | 81 | 4.3% |
건 | 81 | 4.3% |
및 | 60 | 3.2% |
Other values (109) | 767 |
Uppercase Letter
Value | Count | Frequency (%) |
A | 155 | |
Y | 108 | |
R | 64 | |
D | 56 | 10.5% |
C | 36 | 6.7% |
E | 30 | 5.6% |
M | 29 | 5.4% |
B | 7 | 1.3% |
G | 6 | 1.1% |
S | 6 | 1.1% |
Other values (12) | 37 | 6.9% |
Decimal Number
Value | Count | Frequency (%) |
0 | 127 | |
1 | 31 | 12.2% |
2 | 28 | 11.0% |
3 | 18 | 7.1% |
4 | 14 | 5.5% |
5 | 11 | 4.3% |
6 | 9 | 3.5% |
7 | 7 | 2.8% |
8 | 7 | 2.8% |
9 | 2 | 0.8% |
Other Punctuation
Value | Count | Frequency (%) |
/ | 2 | |
, | 2 |
Space Separator
Value | Count | Frequency (%) |
403 |
Dash Punctuation
Value | Count | Frequency (%) |
- | 129 |
Close Punctuation
Value | Count | Frequency (%) |
) | 122 |
Open Punctuation
Value | Count | Frequency (%) |
( | 122 |
Most occurring scripts
Value | Count | Frequency (%) |
Hangul | 1877 | |
Common | 1034 | |
Latin | 534 | 15.5% |
Most frequent character per script
Hangul
Value | Count | Frequency (%) |
설 | 167 | 8.9% |
공 | 139 | 7.4% |
안 | 135 | 7.2% |
사 | 132 | 7.0% |
동 | 129 | 6.9% |
치 | 99 | 5.3% |
조 | 87 | 4.6% |
기 | 81 | 4.3% |
건 | 81 | 4.3% |
및 | 60 | 3.2% |
Other values (109) | 767 |
Latin
Value | Count | Frequency (%) |
A | 155 | |
Y | 108 | |
R | 64 | |
D | 56 | 10.5% |
C | 36 | 6.7% |
E | 30 | 5.6% |
M | 29 | 5.4% |
B | 7 | 1.3% |
G | 6 | 1.1% |
S | 6 | 1.1% |
Other values (12) | 37 | 6.9% |
Common
Value | Count | Frequency (%) |
403 | ||
- | 129 | 12.5% |
0 | 127 | 12.3% |
) | 122 | 11.8% |
( | 122 | 11.8% |
1 | 31 | 3.0% |
2 | 28 | 2.7% |
3 | 18 | 1.7% |
4 | 14 | 1.4% |
5 | 11 | 1.1% |
Other values (6) | 29 | 2.8% |
Most occurring blocks
Value | Count | Frequency (%) |
Hangul | 1877 | |
ASCII | 1568 |
Most frequent character per block
ASCII
Value | Count | Frequency (%) |
403 | ||
A | 155 | 9.9% |
- | 129 | 8.2% |
0 | 127 | 8.1% |
) | 122 | 7.8% |
( | 122 | 7.8% |
Y | 108 | 6.9% |
R | 64 | 4.1% |
D | 56 | 3.6% |
C | 36 | 2.3% |
Other values (28) | 246 |
Hangul
Value | Count | Frequency (%) |
설 | 167 | 8.9% |
공 | 139 | 7.4% |
안 | 135 | 7.2% |
사 | 132 | 7.0% |
동 | 129 | 6.9% |
치 | 99 | 5.3% |
조 | 87 | 4.6% |
기 | 81 | 4.3% |
건 | 81 | 4.3% |
및 | 60 | 3.2% |
Other values (109) | 767 |
구분 | 계약번호 | 계약명 | 계약자 | 단위공사명 | |
---|---|---|---|---|---|
구분 | 1.000 | 0.993 | 0.940 | 0.992 | 0.942 |
계약번호 | 0.993 | 1.000 | 1.000 | 0.998 | 0.974 |
계약명 | 0.940 | 1.000 | 1.000 | 1.000 | 0.936 |
계약자 | 0.992 | 0.998 | 1.000 | 1.000 | 0.940 |
단위공사명 | 0.942 | 0.974 | 0.936 | 0.940 | 1.000 |
계약번호 | 계약명 | 계약자 | 구분 | |
---|---|---|---|---|
계약번호 | 1.000 | 0.987 | 0.974 | 0.881 |
계약명 | 0.987 | 1.000 | 0.996 | 0.867 |
계약자 | 0.974 | 0.996 | 1.000 | 0.872 |
구분 | 0.881 | 0.867 | 0.872 | 1.000 |
구분 | 계약번호 | 계약명 | 계약자 | |
---|---|---|---|---|
구분 | 1.000 | 0.881 | 0.867 | 0.872 |
계약번호 | 0.881 | 1.000 | 0.987 | 0.974 |
계약명 | 0.867 | 0.987 | 1.000 | 0.996 |
계약자 | 0.872 | 0.974 | 0.996 | 1.000 |
구분 | 계약번호 | 계약명 | 계약자 | 단위공사명 | |
---|---|---|---|---|---|
0 | 설계기술용역 | C0993-11-2012 | 안동천연가스발전소 사택신축 설계 용역 | (주)유탑엔지니어링건축사사무소 | XA02 안동-사택신축 공사(별도발주) |
1 | 설계기술용역 | PAD-P-M02 | 안동천연가스발전소 보조보일러 설치조건부 구매계약 | 한신보일러(주) | BM02 안동-보조보일러 구매 |
2 | 설계기술용역 | 제2011-3-05호 | 안동천연가스발전소 건설 설계기술용역 | 현대엔지니어링(주) | A 안동-설계기술용역 |
3 | 설계기술용역 | 제2011-3-05호 | 안동천연가스발전소 건설 설계기술용역 | 현대엔지니어링(주) | A 안동-설계기술용역 |
4 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YJ01 안동-(YARD)계측제어설비 공사 |
5 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YM02 안동-(YARD)공용설비설치 및 기타부대공사 |
6 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YC07 안동-(YARD)구내도로 및 배수공사 |
7 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YC08 안동-(YARD)기타부대공사 |
8 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YC02 안동-(YARD)발전용수 취수시설 및 관로 축조공사 |
9 | 시공도급계약 | 2012-03-01 | 안동천연가스발전소 야드 건설공사(경일건설) | 경일건설 주식회사 | YA04 안동-(YARD)보안 및 기타부대공사 |
구분 | 계약번호 | 계약명 | 계약자 | 단위공사명 | |
---|---|---|---|---|---|
119 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AM03 안동-(설치조건)증기터빈 및 부속설비 설치공사 |
120 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AE03 안동-(설치조건)케이블 트레이 및 전선관 설치공사 |
121 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AE04 안동-(설치조건)케이블 포설공사 |
122 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AA01 안동-(설치조건)터빈 건물 신축공사 |
123 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AA02 안동-(설치조건)터빈 발전기 및 옥내기기 기초공사 |
124 | 시공도급계약 | PAD-P-11EF1 | 안동주기기구매_GS(보험포함, 잠정분) | 지에스건설(주) | AM05 안동-(설치조건)플랜트 배관공사 |
125 | 시공도급계약 | PAD-P-M01 | 안동천연가스발전소 수폐수처리설비 구매 | 한성크린텍(주) | BM01 안동-(설치조건)수폐수처리설비 설치공사 |
126 | 시공도급계약 | PAD-P-M01 | 안동천연가스발전소 수폐수처리설비 구매 | 한성크린텍(주) | BM01 안동-(설치조건)수폐수처리설비 설치공사 |
127 | 시공도급계약 | PAD-P-M02 | 안동천연가스발전소 보조보일러 설치조건부 구매계약 | 한신보일러(주) | BM02 안동-(설치조건)보조보일러 설치공사 |
128 | 시공도급계약 | PAD-P-M05 | 안동천연가스발전소 탈질설비 설치조건부 구매계약 | (주)코캣 | BM03 안동-탈질설비 구매 |
Most frequently occurring
구분 | 계약번호 | 계약명 | 계약자 | 단위공사명 | # duplicates | |
---|---|---|---|---|---|---|
0 | 설계기술용역 | 제2011-3-05호 | 안동천연가스발전소 건설 설계기술용역 | 현대엔지니어링(주) | A 안동-설계기술용역 | 2 |
1 | 시공도급계약 | PAD-P-M01 | 안동천연가스발전소 수폐수처리설비 구매 | 한성크린텍(주) | BM01 안동-(설치조건)수폐수처리설비 설치공사 | 2 |